Why Buy Automotive Rubber Parts from Qinghe, Hebei?
Qinghe County in Xingtai, Hebei Province, has developed over three decades into a specialised cluster for automotive rubber and plastic parts: sealing strips, hoses, moulded components and filter elements. For an overseas buyer, sourcing from a cluster like Qinghe offers concrete advantages.
Advantages of a mature cluster
- Short tooling lead time: die makers, mould shops and compound suppliers are local, so a new profile die or compression mould can be produced in days rather than weeks.
- Complete supply chain: raw polymers, carbon black, blowing agents, metal carriers and 3M-type tapes are stocked locally.
- Skilled labour: extrusion operators and cure-line technicians with years of specific experience.
- Logistics: road access to Tianjin and Qingdao ports, plus rail and courier options for samples.
Those four points explain why the cluster exists. They do not, on their own, tell you whether a given part will fit your vehicle programme. The rest of this page covers the technical and commercial details that decide whether a Qinghe-sourced rubber part works on your line: material choice, tolerance, tooling, sampling and order terms.
What Qinghe suppliers actually make
Qinghe's automotive rubber output is not one product. It splits into a few families, and each family has its own material logic, tooling and failure modes.
Sealing strips and profiles
Door, window, trunk, hood and truck-body seals. These are extruded, often as dense and sponge sections co-extruded together, and frequently with a steel belt or metal carrier inside the profile. EPDM is the default compound because it holds up to weather and ozone over years of outdoor exposure. Typical hardness is 50-75 Shore A, and the working temperature band is about -40°C to +120°C. See the rubber sealing strip range for the profile types we run.
Hoses and air pipes
Air intake hoses, turbo hoses, coolant hoses and low-pressure oil pipes. Material choice is driven by what flows through the hose and how hot it gets. EPDM, NBR, CR, silicone and PA+GF (plastic-plus-rubber) are all in use. Silicone (VMQ) covers roughly -60°C to +200°C, which is why it is the usual pick for turbo and high-temperature ducting. The air intake hose & air pipe category covers the geometry side; the rubber vs silicone temperature rating note explains where the two overlap.
Moulded and bonded parts
Grommets, bushings, mounts, bellows, O-rings, gaskets and rubber-to-metal bonded parts. These come off compression, transfer or injection moulding rather than an extrusion line, so tooling cost and cycle time behave differently from a profile die. See moulded rubber parts.
A/C hose assemblies
Barrier and non-barrier A/C rubber hose built into assemblies with crimped fittings. Refrigerants in current use are R134a, R1234yf and R404A; working pressure is up to 3.5 MPa and the temperature band is about -40°C to +135°C. Assemblies are 100% leakage and pressure tested before packing. Examples include the CA5 model truck A/C hose assembly and the EA48 model truck A/C hose assembly.
Material selection table
Use this as a first filter. Final compound selection still depends on the actual medium, duty cycle and drawing.
| Material | Typical parts | Working temperature | Key property |
|---|---|---|---|
| EPDM | Door/window/trunk/hood seals, coolant-side hose | About -40°C to +120°C | Excellent weather and ozone resistance |
| Silicone (VMQ) | Turbo and air intake hose, coolant hose, high-temperature ducting | About -60°C to +200°C | Good for high-heat areas |
| NBR | Low-pressure oil pipe, fuel-related seals, oil-resistant parts | About -30°C to +100°C | Oil resistance |
| NR / SBR | General buffer and anti-vibration parts | Depends on compound | General-purpose buffering |
| TPV / TPE | Co-extruded sealing strip with metal carrier or steel belt | Depends on compound | Recyclable |
Hardness for EPDM sealing profiles is usually quoted at 50-75 Shore A. If you do not have a hardness figure on your drawing, say so and we will propose one rather than guess silently.
Processes available in the cluster
The process list matters because it determines whether your part can be made at all without a new tooling route. Qinghe shops commonly run: extrusion (dense, sponge, and co-extrusion with steel belt), moulding (compression and injection), vulcanising and bonding, cutting, punching, notching, corner moulding, adhesive tape lamination and flocking. Development can start from a drawing (PDF, STEP, IGES or DWG), from a physical sample, or from a description plus a target application.
What to specify before you request a quotation
Vague enquiries produce vague quotations, and vague quotations produce disputes at inspection. Put these on one page before you send an RFQ:
- Material or application: name the compound (EPDM, silicone, NBR, NR/SBR, TPV/TPE, PA+GF) or describe the medium and the environment. “Ozone exposure outdoors” and “oil contact” point to different compounds.
- Hardness: Shore A target and tolerance band.
- Temperature range: continuous working temperature, plus any short-term peak.
- Medium and exposure: air, coolant, refrigerant, fuel, oil; indoor or outdoor; UV and ozone; salt spray if relevant.
- Drawing or sample: a dimensioned drawing is best. A physical sample is workable. State which dimensions are critical and which are free.
- Quantity: trial quantity and expected annual volume. These two numbers drive tooling and unit price more than anything else.
- Testing and documentation: what you need on paper — material certificate, RoHS/REACH statement, certificate of origin, packing list, third-party test reports.
- Packaging and marking: carton spec, labels, pallet type, any barcode or customer-part-number requirement.
MOQ, tooling, lead time and sampling
These are the numbers buyers ask about first, so here is how they actually behave.
MOQ
MOQ depends on the item. For standard extruded sealing strip it is usually 500-1000 m. For moulded parts and hose assemblies it is usually 200-500 pcs. Smaller trial orders can be discussed — a trial run is a normal way to start.
Tooling
New moulds usually take 15-25 days. Profile dies are faster because the local die-making chain is short, which is one of the genuine advantages of the cluster.
Lead time
Samples: 7-15 days after drawing or sample confirmation. Mass production: 15-30 days depending on quantity and tooling.
Payment and shipping
For new customers, T/T 30% deposit plus 70% before shipment. L/C at sight for large orders. Terms for long-term customers can be discussed. Shipping is available EXW, FOB Tianjin or Qingdao, CIF or DDP, by sea, air or express (DHL/FedEx/UPS).
Samples
Samples are free or chargeable depending on the item; courier cost is paid by the buyer and is refundable against the first bulk order.
How to reduce risk when sourcing
- Audit the process, not just the showroom: ask for the cure line, the test lab and the tooling shop on the same visit.
- Request batch traceability: compound batch number, cure date and test report for each shipment.
- Start with a sample run: validate on your line before committing to a full container.
- Confirm the export documentation: material certificates, RoHS/REACH statements, certificate of origin and packing list.
- Agree the inspection point: which dimensions and which tests are checked before shipment, and who signs off.
- Keep a golden sample: a signed first-article sample held by both sides is the cheapest dispute-avoidance tool there is.
Two examples of part-level data
Buyers often want to see how much specification detail is available before they commit. For an air intake hose, the data set can include material (EPDM / NBR / CR / silicone / PA+GF), process (extrusion, blow moulding, injection or hand-built), temperature (-40°C to +150°C), testing (vacuum, pressure, heat ageing and vibration) and the option of supplying the part as a kit with clamps, brackets and quick connectors — see the air intake hose inlet tube and the rubber air intake hose / intake manifold listings. Fitment is based on OE number or drawing.
About YUYANG
Hebei Yuyang Auto Parts Co., Ltd. is located in Chengguan Industrial Zone, Gexianzhuang Town, Qinghe County. We supply air-conditioning hose assemblies, cooling hoses, low-pressure oil pipes, air pipes, silicone hoses, moulded rubber parts and sealing strips, and our products are used by BYD, SAIC Maxus, Sinotruk, FAW, Dayun, Skywell and Zongshen. Visitors are welcome — contact us to arrange a factory audit or a video tour.
We are a factory, not a trading company, and we accept OEM and ODM work. We develop from a drawing (PDF, STEP, IGES or DWG), a physical sample, or a description plus application. Third-party test reports are available on request. If you have a drawing or a worn sample on your desk, send it over and we will tell you what tooling and lead time it needs.
FAQ
What is the minimum order quantity for Qinghe rubber parts?
It depends on the item. Standard extruded sealing strip is usually 500-1000 m; moulded parts and hose assemblies are usually 200-500 pcs. Smaller trial orders can be discussed, which is the usual way a new buyer starts.
How long does tooling and sampling take?
New moulds usually take 15-25 days. Samples are 7-15 days after drawing or sample confirmation, and mass production is 15-30 days depending on quantity and tooling. A new profile die is typically faster than a mould because the local die-making chain is short.
Which material should I choose for a high-temperature hose?
Silicone (VMQ) covers roughly -60°C to +200°C and is the usual choice for turbo and high-temperature ducting. EPDM covers about -40°C to +120°C and is the better fit for weather and ozone exposure on sealing profiles. NBR is the oil-resistant option at about -30°C to +100°C.
Can I order from a drawing or a sample instead of a full specification?
Yes. We can develop from a drawing in PDF, STEP, IGES or DWG, from a physical sample, or from a description plus the application. Fitment for hoses and A/C assemblies is normally based on OE number or drawing.
How do I verify quality before placing a mass order?
Ask for a sample run and validate it on your line. Ask for batch traceability (compound batch number, cure date, test report). Agree the inspection point before shipment and keep a signed golden sample on both sides. Third-party test reports are available on request.
What shipping and payment terms are available?
EXW, FOB Tianjin or Qingdao, CIF and DDP, by sea, air or express (DHL/FedEx/UPS). For new customers, T/T 30% deposit plus 70% before shipment; L/C at sight for large orders; terms for long-term customers can be discussed.
Frequently asked questions
Ask Us About This Topic
Tell us what you need — we reply with a quotation within 12 hours.